As the Deployment Templates are created and maintained in the CapaOne portal, a synchronization of Images and Diskconfigs from the CMS installation to the CapaOne portal, and Deployment Templates from CapaOne CapaOne portal to the CMS Installation is required.
It is required that a replicator is assigned the Synchronize CapaOne task. This is done in the System Administration plugin/Global Tasks.
A schedule should be configured, depending on the frequency of changes to Images, Disk configurations and Deployment Templates.
A synchronization can be performed from the OS point right click menu.
This will force the replicator configured in Global Tasks, to perform a synchronization with CapaOne.