Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

Use the traceroute overviews: Select ANALYZE > Overview > Trace Route and then either Trace Route Graph or the simple table-based Trace Route Overview.

Adjust Thresholds for Traceroute Graph Colors

When you view traceroute graphs, the arrows between the nodes in the traceroute are colored according to the amount of latency they represent:

  •  Green: Responsible for a latency of up to 20 milliseconds

  •  Yellow: Responsible for a latency of 21-50 milliseconds

  •  Red: Responsible for a latency of more than 50 milliseconds

As an administrator you can change the thresholds used for coloring the arrows: Select ADMINISTRATION > Setup > Parameters, select the Display tab, scroll down to the Miscellaneous section and change the Trace Route Limit Yellow and Trace Route Limit Red settings as required.

  • No labels